Crane Lift Planning Checklist
Go through this list before the crane company calls you back.
Start with the weight. A guess is better than nothing, but the real number from a spec sheet or shipping ticket is better still, and the crane company will ask for it first.
Then walk the spot where the crane will set up. Federal OSHA rules say a crane can't be set up unless the ground is firm, drained and graded well enough to meet the maker's specs, with mats or blocking if needed. If you know about a septic tank, a buried line or a soft patch there, tell the crane company.
Look up. If any part of the crane or load could get within 20 feet of a power line, OSHA requires extra steps, such as having the utility shut the line off. The utility has to tell you the line's voltage within two working days of being asked, so call early. And if anyone will be digging for footings or posts, New Mexico law says to call 811 at least two full working days first.

What goes into it
- Weight of the heaviest piece
- Distance from the crane to where the load lands
- Ground at the setup spot, and anything buried under it
- Power lines within reach
- 811 ticket if there's digging
- A backup day for wind
How it goes
- Fill in the list.
- Call or send the form.
- A crane company reviews it and calls you.
- They plan the lift and quote it.
Questions people ask
How close can a crane get to a power line?
OSHA uses 20 feet as the starting point for lines up to 350,000 volts. Closer than that, extra steps are required.
Who checks the ground?
OSHA puts it on the controlling party at the site to make sure the ground is ready. Tell the crane company what you know.
Do I need to call 811 for a crane?
Only if someone will dig. Then call at least two full working days ahead.